Hussein Jameel 1350 Van Buren St. • Phoenix, AZ 85007 jameelhn@gmail.com • Mobile 210.849.9656 Project Lead planner Accomplished
and safety-focused professional skilled in managing high-dollar engineering
and construction engagements; resourceful project leader adept at
prioritizing schedules, managing resources, building strong relationships
with stakeholders, and achieving client goals. Adaptive and level headed
under pressure, with organizational, problem solving, and communication
talents critical to achieving top performance from teams and ensuring projects
are delivered on time and on budget. Highlights
of expertise:
Education and Credentials Bachelor of Science in Civil / Construction Engineering - 2005 University of Technology, Baghdad,
Iraq Professional Certification & Training
•
Engineer in Training (EIT) Certificate (2013) -
Texas Engineering Board •
OSHA 30-Hour Safety Training (2010) •
Certified Concrete Field Testing Technician,
Grade 1 (2007) - American Concrete Institute (ACI) Technical Proficiencies
•
MS Office (Excel, PowerPoint, Word), MS Project, Primavera p3, and 6. Professional Experience Tessenderlo Kerley Services, Phoenix,
Arizona Project
Planner Engineer, 06/2014 – To Present •Provided leadership, training, guidance,
scheduling and mentoring to the project controls/Planner team for Multiple
Designs and Builds Petrochemical plants . •Developed and maintained P6 master project
schedule integrated with cost elements for earned value analysis and
reporting. •Implemented an Earned Value Management System in
accordance with TKI procedure/requirements to monitor and report on a monthly
basis schedule performance ratios. GE Oil & Gas/ Schertz, TEXAS Planner/Scheduler,
2013 – 2014 Plan
engineering, Procurement and production tasks of Liquefaction Natural Gas
Modules project which include 10 MMLS UNITS provide 2.5 MTPA of liquefaction
capacity (US$700 million). Key Contributions: 1.Updating&Maintain Master Project Schedule
using Primavera 6 software. 2. Preparing Weekly/ Monthly Schedule Reports 3. perform a Risk Analysis 4. Create progress measurement tracking
system& S-curve using Microsoft Excel software. ExxonMobil / Fluor, Basra, Iraq Planner/Scheduler,
2011 – 2013 Leverage
Planning & Scheduling Professional (PSP) and Project Management
Professional (PMP) methodologies to drive multimillion-dollar oil field
construction projects. Lead data collection, analysis, and verification for
surface / subsurface exploration, soil sampling, and in-situ tests. Create
and monitor project plans, schedules, milestones, and construction activities
across multiple sites, and facilitate change management processes. Key Contributions: •
Responsible for Primavera (P6) Planning and
scheduling at West Querna Oil Field; recently finalized metering skid project
across three sites. •
Prepared RFIs and project documentation for
contract administration; established contractor scope of authority and lines
of communication, and performed quality assurance and quality control
(QA/QC). •
Designed foundation forms of metering skid,
sampling skid, local electrical room roof, air compressor, and related
special structures in line with US and international building codes. Environmental & Chemical Corporate (ECC), Baghdad, Iraq and Camp Bastion, Afghanistan Construction Engineer
2008 – 2011 Participated
in building heavy construction and civil engineering projects for US Air
Force and US Corps of Engineers. Prepared and reviewed design drawings,
planned project assignments on Primavera (P3 & P6) and controlled change
/ scope creep; supervised contractors for concrete, foundation, underground
ductwork, carpentry, painting, structural and rebar, and equipment
operations. Implemented quality plans at sites; conducted audits,
investigated quality issues, and aided in defining and communicating lessons
learned. Monitored contracts and ensured compliance with project schedule,
cost, quality, safety, and security requirements. Key Contributions: •
Integral member of engineering design and
construction staff on $60M project to build two multi-story headquarters
buildings, water line network (including three 250m wells, pump station, RO
unit, and 10km PVC pipe), and 3km roadway. •
Directed structural and load analysis, concrete
foundation and steel structure design, and installations on $200M project to
construct Baghdad facility for Directorate General Intelligence Service
(DGIS). Weston Solutions, Inc., Baghdad,
Iraq Construction Engineer 2005 – 2008 Performed CAD
design, coordinated subcontractor construction activities, and spearheaded
field verification of design and quality compliance requirements during
construction of 60+ concrete / steel facilities for US government and
military customers. Key Contributions: •
$150M project to construct Iraqi Special
Operations Facility near Baghdad International Airport; construction included
barracks and recreational buildings, DFAC, motor pool, medical aid stations,
fuel stations, power plant, reverse osmosis water purification units, sewer /
water / electrical networks, and waste water treatment plant. •
Implemented QA / QC program that included three
phases of control, providing for quicker identification and correction of
quality issues during construction. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|